From one tap to a whole bathroom
Most jobs are small. A toilet that keeps running, a mixer tap that no longer shuts off properly, a basin that has come loose. We do those in a morning, with parts from the van.
A complete bathroom takes two to three weeks, depending on the tiling. The tiling is done by a tiler we have worked with for years. You have one point of contact: Tom, or the plumber running the job.
Less water, same comfort
A dual flush on the toilet and a water-saving shower head easily save a family of four 20,000 litres of water a year. They don't cost much, and if we're working on your bathroom anyway we fit them for free.




